Work

Transport infrastructure

Hakodate Airport Domestic Passenger Terminal

  • Building owners

    Hakodate Airport Building Co., Ltd.

  • Location

    Hakodate City

  • Completion

    2005/12

  • Number of Levels

    3F/B1

  • Total floor area

    20,066m²

  • Design

    Joint venture of Azusa Sekkei, Create Yamamoto design office

Among the many expansion and renovation projects involving airport passenger terminals, this project was reconstructed while gradually passing out operation of the existing facilities, so that the work was carried out over a total period of 42 months. It was a technically difficult project requiring high-level technology and a careful execution scheme so that user services could be maintained and restrictions such as the low ambient temperature of the surrounding area could be overcome.

Photographing:Niitsu Shashin Co., Ltd.