Hakodate Airport Domestic Passenger Terminal
- Building owners
Hakodate Airport Building Co., Ltd.
- Location
Hakodate City
- Completion
2005/12
- Number of Levels
3F/B1
- Total floor area
20,066m²
- Design
Joint venture of Azusa Sekkei, Create Yamamoto design office
Among the many expansion and renovation projects involving airport passenger terminals, this project was reconstructed while gradually passing out operation of the existing facilities, so that the work was carried out over a total period of 42 months. It was a technically difficult project requiring high-level technology and a careful execution scheme so that user services could be maintained and restrictions such as the low ambient temperature of the surrounding area could be overcome.